Home / Battery Storage / Baltimore County, MD
Public permit data · updated Oct 18, 2026

Residential battery storage permits in Baltimore County, MD

61 residential battery storage permits issued by Baltimore County (electrical), Baltimore County (building), the 8 weeks ending Oct 17, 2026. Oct 17, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 17, 2026, 61 residential battery storage permits were issued in Baltimore County, MD, according to public records from Baltimore County (electrical), Baltimore County (building). The busiest ZIP codes were 21234 (6 permits), 21117 (5 permits), 21208 (5 permits). The median declared value was $38,637 across 25 permits that list one. The latest permit date published is Oct 17, 2026.

61
residential battery storage permits, the 8 weeks ending Oct 17, 2026
$38,637
median declared value (25 with value)
28
ZIP codes with at least one permit
Oct 17, 2026
latest permit date published
7.6
permits per collected week on average
30
days with at least one permit issued

What a battery storage permit means in Baltimore County

A residential battery storage permit means a home is adding a battery system, often alongside solar or a panel upgrade. For a storage or solar installer it shows where backup power is selling.

In Baltimore County, permits were issued on 30 different days in the window; the most recent were Oct 15, 2026, Oct 14, 2026, Oct 13, 2026. The busiest ZIPs were 21234 (6), 21117 (5), 21208 (5).

By residential battery storage permit count, Baltimore County ranks #11 of the 37 battery storage pages on this site and #1 of 3 in MD.

  • Mail neighbors of each install.
  • Pitch storage to nearby homes that pulled solar permits without a battery.
  • See which installers lead storage permits in your ZIPs.

See plans for Baltimore County battery storage leads

Other work on the same permits

Share of these 61 permits whose type or description also matches another trade. These are the follow-on and partner trades on Baltimore County jobs.

  • electrical: 61 permits (100%)
  • solar: 37 permits (61%)
  • windows & doors: 14 permits (23%)
  • HVAC: 1 permits (2%)

Weekly trend

Permits per 7-day period, ending Oct 17, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 29Sep 5Sep 12Sep 19Sep 26Oct 3Oct 10Oct 17

Top permit types

Permit type / subtypePermitsShare
RESIDENTIAL ELECTRICAL3659%
Residential New / Res. Permit - Solar Panel SFD2134%
Residential New / Res. Permit - Solar Panel RURAL RESIDENTIAL SFD47%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
21234610%0.75
2111758%0.62
2120858%0.62
2123647%0.50
2122147%0.50

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

System stated in the permit

SystemPermitsShare
with solar4370%
backup / ESS4269%
panel / service upgrade3659%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeSystemDeclared value
2026-10-1521221Residential New / Res. Permit - Solar Panel SFDsolar + battery + electricalwith solar; panel / service upgrade; backup / ESS$19,404
2026-10-0621117RESIDENTIAL ELECTRICALsolar + battery + electrical + windows/doorswith solar; panel / service upgrade; backup / ESSn/a
2026-09-2821219Residential New / Res. Permit - Solar Panel SFDsolar + battery + electricalwith solar; panel / service upgrade; backup / ESS$24,000
2026-09-2321236Residential New / Res. Permit - Solar Panel SFDsolar + battery + electricalwith solar; panel / service upgrade; backup / ESS$59,926
2026-09-1721117RESIDENTIAL ELECTRICALbattery + electricalwith solarn/a
2026-09-0321120RESIDENTIAL ELECTRICALbattery + electricalnot statedn/a

Source

  • Baltimore County (building): Permit records on bcgisdata.baltimorecountymd.gov, published by Baltimore County (building). Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.
  • Baltimore County (electrical): Permit records on bcgisdata.baltimorecountymd.gov, published by Baltimore County (electrical). Source dataset. Collected window(s): Aug 23, 2026 – Oct 17, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Battery Storage = the permit's type or work description matches the Curbside Signal battery storage rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Baltimore-Columbia-Towson, MD metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: Battery installs come with solar and panel work. A solar-only permit is a battery prospect.

Questions

How many residential battery storage permits were issued in Baltimore County, MD recently?

61 residential battery storage permits in the public records we pulled, the 8 weeks ending Oct 17, 2026. Source: Baltimore County (electrical), Baltimore County (building).

Which Baltimore County ZIP codes have the most battery storage permits?

21234 (6 permits), 21117 (5 permits), 21208 (5 permits), by residential battery storage permit count the 8 weeks ending Oct 17, 2026. 28 ZIP codes had at least one permit.

What is the median declared value of a residential battery storage permit in Baltimore County?

$38,637, across 25 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Baltimore County battery storage permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Baltimore County battery storage leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing