Residential electrical permits in Ashton, MD
11 residential electrical permits issued by Montgomery County MD (electrical), the 8 weeks ending Oct 15, 2026. Oct 15, 2026 is the latest issue date the source has published.
Quick answer. In the 8 weeks ending Oct 15, 2026, 11 residential electrical permits were issued in Ashton, MD, according to public records from Montgomery County MD (electrical). The busiest ZIP codes were 20861 (11 permits). The latest permit date published is Oct 15, 2026.
What an electrical permit means in Ashton
A residential electrical permit covers panel and service upgrades, EV chargers, solar and battery tie-ins, rewires and new circuits. For an electrician it shows where homes are adding load, which usually means more panel and charger work on the same street.
In Ashton, permits were issued on 9 different days in the window; the most recent were Oct 14, 2026, Oct 12, 2026, Oct 7, 2026. The busiest ZIPs were 20861 (11).
By residential electrical permit count, Ashton ranks #104 of the 110 electrical pages on this site and #20 of 20 in MD.
- Mail EV-charger and panel-upgrade offers around each permit.
- Partner with the solar and HVAC installers who pull permits in your ZIPs: their jobs often need your work.
- Watch service-upgrade volume by ZIP to plan crews and stock.
Other work on the same permits
Share of these 11 permits whose type or description also matches another trade. These are the follow-on and partner trades on Ashton jobs.
- generator: 3 permits (27%)
- HVAC: 1 permits (9%)
- solar: 1 permits (9%)
- battery storage: 1 permits (9%)
Weekly trend
Permits per 7-day period, ending Oct 15, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.
Top permit types
| Permit type / subtype | Permits | Share |
|---|---|---|
| ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING | 11 | 100% |
Busiest ZIP codes
| ZIP | Permits | Share | 8-wk avg / week |
|---|---|---|---|
| 20861 | 11 | 100% | 1.38 |
8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.
Work stated in the permit
| Work | Permits | Share |
|---|---|---|
| panel / service upgrade | 2 | 18% |
| solar / battery tie-in | 2 | 18% |
| (200 A) | 2 | 18% |
| (400 A) | 2 | 18% |
| heat pump / HVAC circuit | 1 | 9% |
Parsed from the permit's own type and work text. A permit can state more than one; many state none.
Sample rows
Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.
| Issued | ZIP | Permit type | Scope | Work | Declared value |
|---|---|---|---|---|---|
| 2026-10-14 | 20861 | ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING | electrical | (100 A) | n/a |
| 2026-10-12 | 20861 | ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING | electrical | panel / service upgrade (400 A) | n/a |
| 2026-10-12 | 20861 | ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING | electrical | (400 A) | n/a |
| 2026-10-07 | 20861 | ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING | electrical | panel / service upgrade (200 A) | n/a |
| 2026-10-01 | 20861 | ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING | battery + electrical | panel / service upgrade; solar / battery tie-in | n/a |
| 2026-09-24 | 20861 | ELECTRICAL PERMIT / INSTALL SINGLE FAMILY DWELLING | electrical | (400 A) | n/a |
Source
- Montgomery County MD (electrical): Permit records on data.montgomerycountymd.gov (dataset qxie-8qnp), published by Montgomery County MD (electrical). Source dataset. Collected window(s): Aug 21, 2026 – Oct 15, 2026. Last pulled Oct 18, 2026.
Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). Electrical = the permit's type or work description matches the Curbside Signal electrical rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Washington-Arlington-Alexandria, DC-VA-MD-WV metro: every trade × city page there.
The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:
- Neighbor marketing around active jobs: same-age houses on the same street.
- Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
- Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
- Early-stage projects for commercial trades and GC subs.
Follow-on: Remodels and solar installs are the two biggest drivers of residential electrical work. Pro Signals covers both.
Questions
How many residential electrical permits were issued in Ashton, MD recently?
11 residential electrical permits in the public records we pulled, the 8 weeks ending Oct 15, 2026. Source: Montgomery County MD (electrical).
Which Ashton ZIP codes have the most electrical permits?
20861 (11 permits), by residential electrical permit count the 8 weeks ending Oct 15, 2026. 1 ZIP codes had at least one permit.
What is the median declared value of a residential electrical permit in Ashton?
The source does not publish valuations for these permits.
How do I get the Ashton electrical permit list, and what does it cost?
Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.
Ashton electrical leads, every Monday
Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.