Home / EV Chargers / Winter Park, FL
Public permit data · updated Oct 18, 2026

Residential EV charger permits in Winter Park, FL

10 residential EV charger permits issued by Winter Park, the 8 weeks ending Oct 18, 2026. Oct 18, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 18, 2026, 10 residential EV charger permits were issued in Winter Park, FL, according to public records from Winter Park. The busiest ZIP codes were 32789 (9 permits), 32792 (1 permits). The median declared value was $1,884 across 10 permits that list one. The latest permit date published is Oct 18, 2026.

10
residential EV charger permits, the 8 weeks ending Oct 18, 2026
$1,884
median declared value (10 with value)
2
ZIP codes with at least one permit
Oct 18, 2026
latest permit date published
1.2
permits per collected week on average
10
days with at least one permit issued
9
distinct contractors of record (10 permits name one)

What an EV charger permit means in Winter Park

A residential EV charger permit means a home is adding a Level 2 charger, often with a new circuit or panel upgrade. For an electrician or charger installer it shows which streets are going electric.

In Winter Park, permits were issued on 10 different days in the window; the most recent were Oct 13, 2026, Oct 9, 2026, Oct 3, 2026. The busiest ZIPs were 32789 (9), 32792 (1).

By residential EV charger permit count, Winter Park ranks #23 of the 27 EV charger pages on this site and #2 of 2 in FL.

  • Mail neighbors of each charger install while the EV is in the driveway.
  • Offer panel and service upgrades on the streets with the most chargers.
  • Pass the address to solar installers: EV owners are strong solar prospects.

See plans for Winter Park EV charger leads

Other work on the same permits

Share of these 10 permits whose type or description also matches another trade. These are the follow-on and partner trades on Winter Park jobs.

  • electrical: 10 permits (100%)
  • water heater: 1 permits (10%)
  • garage: 1 permits (10%)
  • HVAC: 1 permits (10%)

Weekly trend

Permits per 7-day period, ending Oct 18, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 30Sep 6Sep 13Sep 20Sep 27Oct 4Oct 11Oct 18

Top permit types

Permit type / subtypePermitsShare
Electrical / Residential Fixtures990%
Electrical / Residential Low Voltage110%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
32789990%1.12
32792110%0.12

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
Level 2 charger990%
panel / service upgrade550%
new circuit330%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-1332789Electrical / Residential Fixtureselectrical + EV chargerLevel 2 charger$750
2026-10-0932789Electrical / Residential Fixtureselectrical + EV chargerLevel 2 charger$1,500
2026-10-0332789Electrical / Residential Low Voltageelectrical + EV chargerLevel 2 charger; panel / service upgrade; new circuit$3,000
2026-09-2432789Electrical / Residential Fixtureselectrical + EV chargerLevel 2 charger$1,500
2026-09-1632789Electrical / Residential Fixtureselectrical + EV chargerLevel 2 charger; panel / service upgrade$2,200
2026-09-1232789Electrical / Residential FixturesHVAC + electrical + EV chargerLevel 2 charger$7,500

Source

  • Winter Park: Permit records on gis.cityofwinterpark.org, published by Winter Park. Source dataset. Collected window(s): Aug 24, 2026 – Oct 18, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). EV Chargers = the permit's type or work description matches the Curbside Signal EV charger rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Orlando-Kissimmee-Sanford, FL metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: EV chargers lead to panel and service upgrades, and often to solar and battery storage.

Questions

How many residential EV charger permits were issued in Winter Park, FL recently?

10 residential EV charger permits in the public records we pulled, the 8 weeks ending Oct 18, 2026. Source: Winter Park.

Which Winter Park ZIP codes have the most EV charger permits?

32789 (9 permits), 32792 (1 permits), by residential EV charger permit count the 8 weeks ending Oct 18, 2026. 2 ZIP codes had at least one permit.

What is the median declared value of a residential EV charger permit in Winter Park?

$1,884, across 10 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Winter Park EV charger permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Winter Park EV charger leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing