Home / New Construction / Salem, OR
Public permit data · updated Oct 18, 2026

Residential new-construction permits in Salem, OR

42 residential new-construction permits issued by Salem OR (structure permits), the 8 weeks ending Oct 16, 2026. Oct 16, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 16, 2026, 42 residential new-construction permits were issued in Salem, OR, according to public records from Salem OR (structure permits). The busiest ZIP codes were 97306 (13 permits), 97317 (11 permits), 97301 (7 permits). The latest permit date published is Oct 16, 2026.

42
residential new-construction permits, the 8 weeks ending Oct 16, 2026
n/a
median declared value
7
ZIP codes with at least one permit
Oct 16, 2026
latest permit date published
5.2
permits per collected week on average
20
days with at least one permit issued

What a new-construction permit means in Salem

A residential new-construction permit is a new home or a trade permit on one. For a builder's sub it shows who is building where; for post-construction trades it's a house that will need finishing.

In Salem, permits were issued on 20 different days in the window; the most recent were Oct 14, 2026, Oct 12, 2026, Oct 8, 2026. The busiest ZIPs were 97306 (13), 97317 (11), 97301 (7).

By residential new-construction permit count, Salem ranks #42 of the 74 new-construction pages on this site and #2 of 2 in OR.

  • Subs: pitch the most active builders.
  • Post-construction trades: plan around completion dates.
  • Track declared values by ZIP.

See plans for Salem new-construction leads

Other work on the same permits

None of these permits match another trade in our rules.

Weekly trend

Permits per 7-day period, ending Oct 16, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9Oct 16

Top permit types

Permit type / subtypePermitsShare
New / Single Family1843%
Master Plan-Additional / Single Family1126%
New / Accessory Dwelling Unit921%
New / Duplex25%
New / Manufactured Dwelling12%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
973061331%1.62
973171126%1.38
97301717%0.88
97302512%0.62
9730437%0.38

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Type stated in the permit

TypePermitsShare
single-family4095%
duplex / townhome37%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeTypeDeclared value
2026-10-1497302New / Single Familynew constructionsingle-familyn/a
2026-10-0897301New / Single Familynew constructionsingle-familyn/a
2026-09-2197317Master Plan-Additional / Single Familynew constructionsingle-familyn/a
2026-09-0997301New / Single Familynew constructionsingle-familyn/a
2026-09-0197317Master Plan-Additional / Single Familynew constructionsingle-familyn/a
2026-08-3197306New / Single Familynew constructionsingle-familyn/a

Source

  • Salem OR (structure permits): Permit records on services.arcgis.com, published by Salem OR (structure permits). Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). New Construction = the permit's type or work description matches the Curbside Signal new-construction rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Salem, OR metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: A new home leads to landscaping, fencing, security, pest control and window coverings.

Questions

How many residential new-construction permits were issued in Salem, OR recently?

42 residential new-construction permits in the public records we pulled, the 8 weeks ending Oct 16, 2026. Source: Salem OR (structure permits).

Which Salem ZIP codes have the most new-construction permits?

97306 (13 permits), 97317 (11 permits), 97301 (7 permits), by residential new-construction permit count the 8 weeks ending Oct 16, 2026. 7 ZIP codes had at least one permit.

What is the median declared value of a residential new-construction permit in Salem?

The source does not publish valuations for these permits.

How do I get the Salem new-construction permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Salem new-construction leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing