Home / EV Chargers / Nashville, TN
Public permit data · updated Oct 18, 2026

Residential EV charger permits in Nashville, TN

10 residential EV charger permits issued by Nashville-Davidson (trade permits), the 8 weeks ending Oct 16, 2026. Oct 16, 2026 is the latest issue date the source has published.

Quick answer. In the 8 weeks ending Oct 16, 2026, 10 residential EV charger permits were issued in Nashville, TN, according to public records from Nashville-Davidson (trade permits). The busiest ZIP codes were 37215 (3 permits), 37206 (2 permits), 37221 (1 permits). The median declared value was $1,500 across 9 permits that list one. The latest permit date published is Oct 16, 2026.

10
residential EV charger permits, the 8 weeks ending Oct 16, 2026
$1,500
median declared value (9 with value)
7
ZIP codes with at least one permit
Oct 16, 2026
latest permit date published
1.2
permits per collected week on average
7
days with at least one permit issued
4
distinct contractors of record (10 permits name one)

What an EV charger permit means in Nashville

A residential EV charger permit means a home is adding a Level 2 charger, often with a new circuit or panel upgrade. For an electrician or charger installer it shows which streets are going electric.

In Nashville, permits were issued on 7 different days in the window; the most recent were Oct 2, 2026, Oct 1, 2026, Sep 29, 2026. The busiest ZIPs were 37215 (3), 37206 (2), 37221 (1).

By residential EV charger permit count, Nashville ranks #23 of the 27 EV charger pages on this site.

  • Mail neighbors of each charger install while the EV is in the driveway.
  • Offer panel and service upgrades on the streets with the most chargers.
  • Pass the address to solar installers: EV owners are strong solar prospects.

See plans for Nashville EV charger leads

Other work on the same permits

Share of these 10 permits whose type or description also matches another trade. These are the follow-on and partner trades on Nashville jobs.

  • electrical: 10 permits (100%)
  • new construction: 1 permits (10%)

Weekly trend

Permits per 7-day period, ending Oct 16, 2026. n/c = not collected yet (before our pipeline started pulling this source). It is not zero. Striped bars are partly collected weeks.

Aug 28Sep 4Sep 11Sep 18Sep 25Oct 2Oct 9Oct 16

Top permit types

Permit type / subtypePermitsShare
Electrical / Full Electrical Permit10100%

Busiest ZIP codes

ZIPPermitsShare8-wk avg / week
37215330%0.38
37206220%0.50
37221110%0.38
37218110%0.12
37204110%0.25

8-wk avg / week is the trailing 8-week weekly average we quote in coverage checks for that ZIP and trade. It counts every source in the ZIP and includes permits with unknown use, so it can be higher than this page's residential count.

Work stated in the permit

WorkPermitsShare
Level 2 charger880%
new circuit110%

Parsed from the permit's own type and work text. A permit can state more than one; many state none.

Sample rows

Anonymized: street address, permit number and any names removed. Subscribers get the full row with address, permit number and source link.

IssuedZIPPermit typeScopeWorkDeclared value
2026-10-0237209Electrical / Full Electrical Permitelectrical + EV chargerLevel 2 charger$1,193
2026-10-0137215Electrical / Full Electrical Permitelectrical + EV chargerLevel 2 charger$2,655
2026-10-0137215Electrical / Full Electrical Permitelectrical + EV chargerLevel 2 charger$2,240
2026-10-0137076Electrical / Full Electrical Permitelectrical + EV charger + new constructionnot stated$8,650
2026-09-2937206Electrical / Full Electrical Permitelectrical + EV chargernew circuit$600
2026-09-2437206Electrical / Full Electrical Permitelectrical + EV chargerLevel 2 charger$1,500

Source

  • Nashville-Davidson (trade permits): Permit records on services2.arcgis.com, published by Nashville-Davidson (trade permits). Source dataset. Collected window(s): Aug 22, 2026 – Oct 16, 2026. Last pulled Oct 18, 2026.

Metric: Residential = the source marks the permit's use as residential (permits with commercial or unknown use are not counted). EV Chargers = the permit's type or work description matches the Curbside Signal EV charger rules. Counts exclude void or cancelled permits. Dates are the jurisdiction's permit issue date. Records are deduplicated on source and permit number. How we count. Part of the Nashville-Davidson--Murfreesboro--Franklin, TN metro: every trade × city page there.

The honest limit. A permit usually means the job is already sold. We say that up front. The value is what happens around it:

  • Neighbor marketing around active jobs: same-age houses on the same street.
  • Cross-trade follow-on demand: new roof → solar, gutters, insulation; remodel → HVAC, electrical, landscaping, pool; new build → pest, security, landscaping.
  • Competitor intelligence: which contractors pull permits where (where the jurisdiction publishes it), and who to recruit as subs.
  • Early-stage projects for commercial trades and GC subs.

Follow-on: EV chargers lead to panel and service upgrades, and often to solar and battery storage.

Questions

How many residential EV charger permits were issued in Nashville, TN recently?

10 residential EV charger permits in the public records we pulled, the 8 weeks ending Oct 16, 2026. Source: Nashville-Davidson (trade permits).

Which Nashville ZIP codes have the most EV charger permits?

37215 (3 permits), 37206 (2 permits), 37221 (1 permits), by residential EV charger permit count the 8 weeks ending Oct 16, 2026. 7 ZIP codes had at least one permit.

What is the median declared value of a residential EV charger permit in Nashville?

$1,500, across 9 permits that list a valuation. Declared values are what the applicant stated on the permit, not the contract price.

How do I get the Nashville EV charger permit list, and what does it cost?

Request a free sample for your ZIPs first. ZIP Pack is $29/mo for one trade and up to 5 ZIPs every Monday; Metro Feed is $99/mo for a whole metro and up to 3 trades, with daily alerts. Guarantee on every package: If a weekly file is late or missing, that month is free. If a month delivers under half the 8-week average permit count for your ZIPs and trade, the next month is free.

Nashville EV charger leads, every Monday

Send your trade and ZIP codes. We'll reply with a real sample from the public records we pull, or tell you plainly that we don't cover you yet.

Request a free sampleSee pricing